Moscow 1-4, RUS

Waste to Energy

Waste Throughput

2,800,000 t/a

Energy Recovered

district heat, electricity

Thermal Energy

4 x 3 x 75.8 MWth

Located at each point of the compass, the four WtE plants in Voskresensk (south), Naro-Fominsk (west), Noginsk (east) and Solnechnogorsk (north) represent the efficient, hygienic future of waste treatment in Moscow. Once they go into operation, the four facilities will supply more than 1.5 million people in the Russian capital with electricity. They will help achieve the energy transition set down in the Green Tariff, which stipulates that by 2022, 4.5% of energy generated in the country must come from renewable resources.

Facts

  • Type of system: air-cooled HZI reciprocating grate
  • Fuel: municipal and industrial waste
  • Calorific value: 6.4-12.0 MJ/kg
  • Maximum throughput per line: 32.9 t/h
  • Number of lines: three lines per plant
  • Boiler design: five-pass boilers
  • Flue gas treatment: dry sorption with hydrated lime and activated carbon, SNCR, heat exchanger for preheating the condensate

Client

  • Alternative Generating Company (AGK-1)

Commencement of Operation

  • in stages through to 2023

Components Supplied by HZI

  • combustion, boiler, flue gas treatment