Herefordshire & Worcestershire, UK

  • EPC turnkey contract for complete plant incl. civil works
  • Located west of Birmingham to recover energy from municipal waste
  • Electrical power export: 18MW, enough to power 43,000 homes
  • Development by Mercia as a Waste Management Service PFI contract for the councils of Herefordshire and Worcestershire

hzi_laengs_hartlebury_neutral_s

Key Facts

Client: Mercia Waste Management Ltd.
Start of operation: 2017
Capacity: 200’000 t/a

Scope of Supply

Complete plant including civil works

Location

-

Poznan, Poland

The new energy-from-waste plant in Poznan̓ underscores Hitachi Zosen Inova’s success as experienced and reliable technology partner for public-private partnerships, and its leading position in the production of thermal energy from municipal solid waste. The two-line plant is designed to convert about 216,000 tonnes of waste per year into electricity and district heat for the local grid.
poznan_s
Key Facts

Client: SITA Zielona Energia
Start of operation: 2016
Capacity: 210’000 t/a

-
Scope of Supply

EPC turnkey contractor for entire plant, excluding civil works

-
Location
maps Poznan , Poland
Documents
-
Links

Client Website: SITA Zielona Energia
Press Release: Start of construction
Press Release: Contract ordering

-

Severnside, UK

The Energy Recovery Centre at Severnside in South Gloucestershire epitomizes Hitachi Zosen Inova’s continuity as a reliable EPC turnkey contractor. The two line facility is designed to convert up to 400,000 tonnes of non-hazardous waste into energy per year, largely comprised of residual household waste on behalf of the West London Waste Authority.
severnside_s
Key Facts

Client: Sita UK
Start of operation: 2016
Capacity: 388’000 t/a

-
Scope of Supply

EPC turnkey contractor for entire Energy Recovery Centre, including civil works

-
Location
-
Documents
-
Links

Client Website: www.sita.co.uk
Press Release: Contract ordering

-

Buckinghamshire, UK

  • Large single line plant
  • Enable for combined heat and power production
  • Hitachi Zosen Inova acting as Turnkey contractor including civils
  • Bottom ash transported to adjacent IBA treatment area
  • Developed in exclusive partnership with FCC UK
  • Link to the timelaps movies

buckinghamshire_s

Key Facts

Client: FCC UK Start of operation: 2015 Capacity: 300’000 t/a

-
Scope of Supply

Complete plant including civil works

-
Location
-
Documents
-
Links

Client Website: www.fccenvironment.co.uk
Press Release: Contract ordering

-

Jabalpur, India

  • First reference plant in India, located in Jabalpur (Central India)
  • Standardized plant design to meet extremely low target price expectations
  • HZIND is consortium leader with overall responsibility for EPC coordination
  • HZIND supplies “chute to stack” technology, as well as materials handling
  • HZI provides support in engineering and project execution
  • Consortium partner is Isgec Heavy Engineering (scope is WSC, BOP, E&IC, Civil Engineering)
  • Based on HZ’s engineering, the client supplies waste crane, stack and emission measurement system

Jabalpur _s

Key Facts

Client: Essel Infraprojects Limited Start of operation: 2015 Capacity: 600 t/d

-
Scope of Supply

Complete comustion system, boiler and flue gas treatment

-
Location
-
Documents
-
Links
-

Ferrybridge, UK

The Ferrybridge multi-fuel plant is the latest example of Hitachi Zosen Inova providing best available technology as a turnkey contractor to key players in the waste and energy sector. The plant, with a thermal capacity of 2 x 117 MW, is designed to use a variety of different fuels, like household and commercial waste, solid recovered fuel, and waste wood. ferrybridge_s
Key Facts

Client: Multifuel Energy Ltd. Start of operation: 2015 Capacity: 513’000 t/a

-
Scope of Supply

General Contractor for entire plant, including civil works

-
Location
-
Documents
-
Links

Client Website: www.multifuelenergy.com
Press Release: Contract ordering
Press Release: UK company awarded
Press Release: Another UK company awarded
Press Release: Apprenticeship awarded

-

Vantaa, Finnland

  • Utilization of municipal waste of the Helsinki metropolitan area
  • Hitachi Zosen Inova supplier of furnace / boiler
  • Combined cycle power plant with superheating of 91 bar steam to 520ºC by exhaust gas of 80 MW gas turbine
  • Combined heat and power production – 107 MW heat and 78 MW electrical power
  • Advanced SNCR system – DyNORTM
  • Designed for maximum energy recovery

Vantaa _s

Key Facts

Client: Westenergy OY Start of operation: 2013 Capacity: 352’000 t/a

-
Scope of Supply

Complete combustion system, boiler and flue gas treatment

-
Location
maps Vantaa , Finland
-
Documents
-
Links

Client Website: www.westenergy.fi
Press Release: Contract ordering

-

Lucerne, Switzerland

  • New plant with 2 lines supplying steam to neighbouring paper mill
  • Hitachi Zosen Inova supplies incineration and flue gas treatment
  • Process aims for high energy efficiency and low emissions using a two-stage dry sorption process with two heat exchangers
  • Advanced technology with Inova grate, staged secondary air injection and advanced combustion control system

lucernce_s

Key Facts

Client: Renergia Zentralschweiz AG Start of operation: 2015 Capacity: 250’000 t/a

-
Scope of Supply

Complete combustion system, boiler and flue gas treatment

-
Location
maps Lucerne , Switzerland
-
Documents
-
Links

Client Website: www.renergia.ch
Press release: Contract ordering
SRF Beitrag: 1. Abfallfeuer

-

Cleveland 4+5, UK

The second extension of the existing energy-from-waste plant on Teeside is a paragim for continuity and reliability of the successful, integrated waste management in the North East of England. The two new lines are designed for 256,000 tonnes of waste per year, including the residual household waste on behalf of three North East councils. cleveland
Key Facts

Client: SITA STW Limited Start of operation: 2014 Capacity: 256’000 t/a

-
Scope of Supply

General contractor for entire plant, including civil works

-
Location
Documents
-
Links

Client Website: www.sita.co.uk
Press Release: Opening Ceremony
Let’s recycle: Defra list reveals efW plants with R1 status

-

Barcelona, Spain

One of the earlier grate-fired waste treatment plants among Hitachi Zosen Inova’s 500 or so references worldwide was delivered to the city of Sant Adrià de Besòs in 1975. Having reliably processed waste over a period of close to 40 years, between 2012 and 2014 the three old grate firings were completely retrofitted to the current state of the art. The energy from waste plant, which treats up to 360,000 tonnes of municipal solid waste per year, is a central pillar of Barcelona’s waste management system. barcelona
Key Facts

Client: Ros Roca S.A. for TERSA Start of operation: 2012-2013 Capacity: 360’000 t/a

-
Scope of Supply

Engineering and delivery of grate combustion system and boiler membrane walls

-
Location
Documents
-
Links

Client Website: www.tersa.cat

-

Vaasa, Finnland

  • EfW plant for 400,000 inhabitants in more than 50 communities in Western Finland
  • First plant in Finland with heat supply to district heating network
  • Combined heat and power production – 40 MW heat and 13 MW electrical power
  • Container system for slag storage
  • Advanced SNCR system – DyNORTM
  • Supplier of furnace, boiler, water steam cycle, district heating system, crane facilities, electrical installation and control system for complete plant, BOP
Key Facts

Client: Westenergy OY
Start of operation: 2013
Capacity: 160’000 t/a

-
Scope of Supply

Entire combustion system, boiler, flue gas cleaning system Combustion, connection to district heating network, electrical systems and the entire control system

-
Location
maps Vaasa , Finnland
Documents
-
Links

Client Website: www.westenergy.fi

-

Hinwil, Switzerland

Kezo Hinwil consits of three combustion lines, two have been built in 1976 and one in 1995. The three flue gas treament units revamped in 1991/1995 used a combination of wet FGT with SCR-DeNOx and have been replaced in 2012 with two lines of the new Hitachi Zosen Inova Xerosorp+ process.

  • 2 new dry flue gas treatment lines behind gas collector with gas from 3 existing thermal waste treatment lines
  • First plant in Switzerland with dry technology
  • New-technology for low-temp. SCR-catalysts
  • Tail-end heat exchangers increase plant efficiency
  • Hitachi Zosen Inova as supplier of complete electromechanical and civil works part of new FGT plant and coordinator for electric & CCS lots

hzi_laengs_hinwil_neutral

Key Facts

Client: KEZO Hinwil
Start of operation: 2012
Capacity: 2 x 120’000 Nm3/h

-
Scope of Supply

XEROSORP+ composed of reactor, clean gas chamber, SCR DeNOx, heat exchanger, ID fan and stack

-
Location
Documents
-
Links

Client Website: www.kezo.ch
Client Website: www.zar-ch.ch
Press Release: New HZI technology

-

Newhaven, UK

With a view to divert residual municipal waste from landfill, the energy recovery facility at Newhaven provides a state of the art integrated waste management solution for East Sussex County Council and Brighton & Hove City Council in the South East of England. The energy-from waste plant will be capable of treating up to 210,000 tons a year of domestic waste and in so doing will export enough electricity to power the equivalent of more than 25,000 homes. newhaven_s
Key Facts

Client: Veolia ES South Downs Ltd
Start of operation: 2011
Capacity: 226’000 t/a

-
Scope of Supply

General contractor in consortium with Hochtief UK for civil works

-
Location
Documents
-
Links

Client Website: www.veolia.co.uk
Let’s recycle: Defra list reveals efW plants with R1 status

-

Oslo, Norway

With the expansion of the erngy-from waste plant at Klemetsrud by a third train, the overall capacity of the plants in the Oslo suburb rises to an annual capacity of 320,000 tonnes. The new plant train, called KA3, with a combustion performance of 20t/h and a heating value of 12 MJ/kg, is designed for maximum recovery of heat and electricity production. oslo_s
Key Facts

Client: EGE Oslo Kommune
Start of operation: 2011
Capacity: 150’000 t/a

-
Scope of Supply

Entire combustion system, boiler, flue gas cleaning system, waste water treatment, connection to district heating network, electrical systems and the entire control system

-
Location
maps Oslo , Norway
Documents
-
Links

Client Website: EGE Oslo Kommune

-

Riverside, UK

The Riverside energy-from waste plant at Belvedere in the London borough of Bexley is Hitachi Zosen Inova’s most recent reference project in the UK. With and average annual capacity of 585,000 tonnes, it will be an important strategic river-served waste management facility for London, helping the capital to manage its own waste, keeping over 100,000 HGVs off the capital’s congested roads each year and making a real contribution to London’s ability to meet its landfill diversion targets while at the same time roducing electricity for more than 66,000 homes. riverside_s
Key Facts

Client: Riverside Resource Recovery Ltd.
Start of operation: 2010
Capacity: 585’000 t/a

-
Scope of Supply

General contractor for entire plant, including civil works and jetty

-
Location
Documents
-
Links

Client Website: www.coryenvironmental.co.uk
Video: Engineering Happiness
Let’s recycle: Defra list reveals efW plants with R1 status

-

Roosendaal, The Netherlands

Located on the side of an operating facility, BAVIRO was established between May 2008 and June 2011 without interfering with the continued operation. BAVIRO’s layout, design and performance meet the ambitious demands of environmental protection, sustainable energy recovery and safe operability. roosendaal_s
Key Facts

Client: SITA ReEnergy Roosendaal B.V.
Start of operation: 2011
Capacity: 291’000 t/a

-
Scope of Supply

General contractor in consortium with BAM Civiel B.V. for civil works and b.o.p.

-
Location
maps Roosendaal , The Netherlands
Documents
-
Links

Client Website: www.sita.nl
Civil contractor Website: Royal BAM Group
Press Release: Opening Celebration

-

Mallorca, Spain

The Balearic Islands – known for their Mediterranean climate and diversified sceneries – are a centre of attraction for millions of tourists and tourism is what drives local developement and welfare. The significant number of island guests causes the population to vary between about 1 million in winter and 6 million in summer. This poses a challenging task for the reliable supply of daily goods and the proper disposal of daily waste. mallorca
Key Facts

Client: Consell de Mallorca / TIRME S.A.
Start of operation: 2009
Capacity: 416’000 t/a

-
Scope of Supply

Lots for furnace/boiler, flue gas treatment and residue treatment in consortium with Ros Roca

-
Location
maps Mallorca , Spain
Documents
-
Links

Client Website: www.tirme.com

-

Bamberg, Germany

The Bamberg energy-from waste plant has been operating for more than 30 years. Now that incineration trains have been modernised, it ranks among Germany’s most advanced waste treatment facilities. bambmers_s
Key Facts

Client: Joint Authority EfW plant city and district of Bamberg
Start of operation: 2007 – 2009
Capacity: 144’000 t/a

-
Scope of Supply

Civil works, combustion system, boiler, auxiliary air condenser, demineralisation plant, control and instrumentation

-
Location
maps Bamberg , Germany
Documents
-
Links

Client Website: www.bnv-bamberg.de

-

Zistersdorf, Austria

The Zisterdorf Energy-from Waste plant is proof of a successful co-operation between waste management and waste treatment. The facility, located 60 km north-east of Vienna, is capable of treating up to 135,000 tons a year of domestic solid waste and processed waste while at the same time exporting sufficient electricity to power more than 25,000 homes. zisterstorf
Key Facts

Client: •A•S•A• Abfall Service Zistersdorf GmbH
Start of operation: 2009
Capacity: 135’000 t/a

-
Scope of Supply

General contractor for entire plant, including civil works

-
Location
maps Zistersdorf , Austria
Documents
-
Links

Client Website: www.asa-group.com

-

Cleveland, UK

The extension of the Teeside energy-from waste plant is a continuation of the successful, integrated waste management in the North East of England. In parallel, the technically independent concept of the third line provided the highest security with regard to availability. The additional line thermally treats 136,000 tonnes a year of residual household waste while exporting sufficient electricity to power more than 10,000 homes cleveland_s
Key Facts

Client: Sita UK
Start of operation: 2008
Capacity: 136,000 t/a

-
Scope of Supply

General contractor for entire plant, including civil works

-
Location
Documents
-
Links

Client Website: www.sita.co.uk
Let’s recycle: Defra list reveals efW plants with R1 status

-

Stassfurt, Germany

The thermal waste treamtent plant EVZA in Stassfurt is an outstanding example illustrating the importance of energy-from waste. The supply of process steam and electricial power from this plant makes a key contribution to the cost-effective operation of the adjacent soda manufacturing plant and thus to the support of an important industrial location. stassfurt_s
Key Facts

Client: EVZA Energie- und Verwertungszentrale GmbH, Anhalt (REMONDIS Group)
Start of operation: 2008
Capacity: 380’000 t/a

-
Scope of Supply

General contractor for entire plant, consortium with Wayss & Freytag

-
Location
maps Stassfurt , Germany
Documents
-
Links

Client Website: www.evza.de

-

Issy-les-Moulineaux, France

The Isséane energy-from waste facility is located in a densely populated Parisian suburb on the banks of the River Seine with a view of the Eiffel Tower. Attractive architecture and environmentally friendly technology were the core concerns of the planners. issy_s
Key Facts

Client: Syctom Paris
Start of operation: 2007
Capacity: 460’000 t/a

-
Scope of Supply

Complete combustion part, boiler, flue gas treatment

-
Location
Documents
-
Links

Client Website: www.syctom-paris.fr

-

Lausanne, Switzerland

High efficiency, low emissions, virtually no visible plumes of steam: The new state treatment plant in Lausanne, in the Canton of Vaud (CH), meets all the standards for a facility located near this urban recreational area. Built using the latest technology, this new plant has now replaced what was once the world’s oldes one still in operation. lausanne_s
Key Facts

Client: TRIDEL SA
Start of operation: 2006
Capacity: 160’000 t/a

-
Scope of Supply

Combustion, flue gas treatment, residue treatment

-
Location
maps Lausanne , Switzerland
Documents
-
Links

Client Website: www.tridel.ch

-

Erfurt, Germany

With the complextion of the residual waste treatment plant at Erfurt, TUS Thüringer UmweltService GbmH has broken new ground in Europe. Comissioned in 2006, the plant combines mechanical-biological treatment with directly connected energy from waste conversion of the high calorific waste fractions. erfurt_s
Key Facts

Client: SITA Abfallverwertung GmbH, Zorbau
Start of operation: 2005
Capacity: 300’000 t/a entry MBT

-
Scope of Supply

General contractor for entire plant, including civil works

-
Location
maps Erfurt , Germany
Documents
-
Links
-

Zorbau, Germany

The triangel by the states of Saxony-Anhalt, Saxony, and Thuringia is one of Germany’s industrial growth areas. This makes orderly local processing of waste an important concern. The AVS Zorbau waste treatment plant, located some 30 km southwest of Leipzig, has been providing reliable around-the-clock treatment of domestic, commercial, and industrial wastes since June 2005. At 300,000 t/a, AVS Zorbau is among the largest capacity plants in Germany. zorbau_s
Key Facts

Client: SITA Abfallverwertung GmbH, Zorbau
Start of operation: 2005
Capacity: 300’000 t/a entry MBT

-
Scope of Supply

General contractor for entire plant, including civil works

-
Location
maps Zorbau , Germany
Documents
-
Links

Client Website: www.sita-deutschland.de

-

Thun, Switzerland

The KVA Thun energy-from-waste plant processes 100,000 tons of combustible waste every year, serving a total of 300,000 residents in 150 communities. The city, located on Lake Thun, is the economic hub of the Bernese Mittelland and Oberland, known for its snow-clad mountains and picturesque landscapes. The plant produces about a third of the electricity consumed in the city of Thun, and also provides district heating for adjacent public-sector facilities. thun_s
Key Facts

Client: AG für Abfallverwertung, AVAG
Start of operation: 2004
Capacity: 100’000 t/a

-
Scope of Supply

Combustion system, boiler, energy recovery, flue gas treatment, fly ash scrubber, wastewater treatment, electrical and control systems

-
Location
maps Thun , Switzerland
Documents
-
Links

Client Website: www.avag.ch

-

Liberec, Czech Republic

With the democratization of the Czech Republic, environmental consciousness has also become an important issue. liberec_s
Key Facts

Client: Termizo AS
Start of operation: 1999
Capacity: 96’000 t/a

-
Scope of Supply

Incineration, flue gas treatment, ash washing, wastewater treatment, guillotine shears

-
Location
maps Liberec , Czech Republic
Documents
-
Links

Client Website: www.termizo.mvv.cz