Rookery South, UK

  • EPC turnkey contract for complete plant incl. civil works
  • 3 lines of combustion and flue gas treatment of 607,500 t/a (668,250 max.) of MSW
  • Located at Rookery South Pit in Bedfordshire, a former brick clay extraction pit, around 100 km north of London
  • Facility generates more than 64 MW of electrical energy – enough to power over 112,500 households

Key Facts

Client: Covanta Rookery South
Start of operation: 2022
Capacity: 607,500 t/a

Scope of Supply

EPC contractor for turnkey plant, including civil works

Links

Project website: www.rookerysouth.co.uk
Construction progress film: January 2020

Statement on COVID-19 Prevention on Rookery South Site
Letter from the Secretary of State to Construction Work in the UK

Top


 

Ivry-sur-Seine, France

  • EPC turnkey contract for complete plant incl. civil works and O&M for one year
  • Consortium IP13 (Suez consortium leader) awarded design, building and operations contract
  • Combined EfW and MBT plant for total waste treatment capacity of around 490,000 t/a of municipal solid waste, replacing a thermal EfW plant from 1960 on the same site
  • HZI responsible for grate and boiler

Key Facts

Client: SYCTOM
Start of operation: 2022
Capacity: 350,000 t/y

Scope of Supply

Technology Supplier for combustion system

Top


Moscow, Russia

  • Pilot project for a total of five planned energy-from-waste plants in Moscow and Kazan
  • HZI providing process technology and key equipment
  • Plant contributes to Russia’s energy strategy according to which by 2020, 4.5% of energy must be from renewable energy sources

Key Facts

Client: RT-Invest
Start of operation: 2022
Capacity: 700,000 t/y

Scope of Supply

Technology supplier for process technology and key equipment

Top


 

Dubai, United Arab Emirates

  • The largest Resource Recovery Facility worldwide
  • Build, Operate and Transfer project for 30 years Operation
  • Joint venture formed by Hitachi Zosen Inova (Switzerland) and BESIX (Belgium), a truly unique partnership, to implement a first class Energy from Waste plant for the Emirate of Dubai
  • The facility will convert approximately 1’500’000 tonnes of waste per year into baseload renewable energy, producing 137MW of electricity at full capacity

Key Facts

Client: Dubai Municipality
Start of operation: 2021
Capacity: 1,825,000 t/y

Scope of Supply

In Joint Venture with BESIX Group EPC contractor for turnkey plant, including civil works. 30 years operation.

Top


Istanbul, Turkey

  • EPC turnkey contract for complete plant incl. civil works and O&M for one year
  • Largest energy-from-waste plant for municipal solid waste in Europe
  • With 1 Mio t/a largest turnkey project ever awarded in Europe
  • The project will be executed by a consortium of Hitachi Zosen Inova and its Turkish partner Makyol
  • Besides electricity the plant provides economical value for the region: One fifth of all components will be produced locally and construction work will be executed by local work forces only

Key Facts

Client: Istanbul Metropolitan Municipality (IMM) Start of operation: 2020 Capacity: 1,000,000 t/y

Scope of Supply

EPC contractor for turnkey plant, including civil works

Location
maps Istanbul , TUR